Stadin designs bridges as well as tall buildings. Four of them are recorded in our project data: Kemang Pratama Bridge in Bekasi, Polychem Bridge in Jakarta, Yasulintex Bridge in Tangerang, and the Ventura – MRT Fatmawati Connecting Bridge in Jakarta. This article sums up the facts about these Stadin-designed bridges, all taken from our project data, and looks at what the numbers tell us.
Four Stadin bridges in one table
| Bridge | Location | Key data | Year |
|---|---|---|---|
| Kemang Pratama Bridge | Bekasi | 48.8 m span, driven piles | 1991 |
| Polychem Bridge | Jl. Daan Mogot, Jakarta | 42 m span, driven piles | 1995 |
| Yasulintex Bridge | Jl. Daan Mogot, Tangerang | 28 m span, driven piles | 2008 |
| Ventura – MRT Fatmawati Connecting Bridge | Jakarta | 55 m long, 4.5 m wide, 741 m² hub | 2024 |
The years shown are the years recorded for each project.
What the Stadin bridges data shows
A few things stand out:
- The list spans 33 years. The earliest bridge is recorded in 1991, just two years after Stadin was founded in 1989. The latest is recorded in 2024.
- The longest span is 48.8 m, at Kemang Pratama Bridge, roughly half the length of a standard 105 m football pitch.
- All three road bridges sit on driven piles. Kemang Pratama, Polychem and Yasulintex are all recorded with driven pile foundations.
- Two bridges are on the Jl. Daan Mogot corridor linking Jakarta and Tangerang: Polychem and Yasulintex.
- The three road bridges add up to 118.8 m of span (48.8 + 42 + 28 m).
Spans and driven piles
For the three earlier bridges, the recorded data is the span and the foundation type. The span is the distance between two bridge supports. The longer the span, the larger the bending moment in the girders, which makes the choice of girder system and depth a key design decision.
Forces from the girders go into the abutments or piers and then into the foundations. On these three bridges the foundations are driven piles: precast piles driven into the ground. Their capacity comes from end bearing at the pile tip and friction along the shaft. We compare them with bored piles in our article on bored piles vs driven piles.
Bridge foundations also have to deal with repeated traffic loads, horizontal forces and the soft ground often found near rivers and canals. The pile type and depth therefore always depend on the site investigation.
Tip: If you are planning an access bridge to an estate or factory, commission the soil investigation early. It decides the foundation type and often affects the schedule and construction method.
A connecting bridge to an MRT station
The latest project on the list is a different kind of structure. The Ventura – MRT Fatmawati Connecting Bridge is recorded as 55 m long and 4.5 m wide, with a 741 m² hub. It is a pedestrian bridge linking a building to a public transport station.
Fatmawati is an elevated station on the North–South Line of the Jakarta MRT, on Jl. R.A. Kartini in Cilandak, South Jakarta. Phase I of the Jakarta MRT, between Lebak Bulus and Bundaran HI, was inaugurated on 24 March 2019.
Connecting bridges like this bring their own challenges:
- Footfall vibration. Light, long pedestrian bridges need checking so that vibration does not feel uncomfortable.
- Meeting other structures. The bridge ends rest on or connect to different structures, so relative movement between them needs suitable connection details.
- Building in a busy area. Working next to roads and operating facilities needs an erection method planned together with the contractor.
Older bridges need checking too
Road bridges built in the 1990s have now carried traffic for decades. Throughout that time, vehicle loads, weather and flowing water keep acting on the structure. Regular inspection helps owners find problems before they grow. Typical items to check:
- Bearings, which transfer girder loads to the abutments or piers and let the girders move with temperature.
- Bridge expansion joints, which are often damaged or clogged, letting water and debris reach the bearings.
- Scour around piers and abutments, especially where a bridge crosses a river or canal.
- Cracking and corrosion in girders, deck slabs and exposed reinforcement.
The findings show whether a bridge simply needs maintenance, repair or strengthening.
Part of Stadin's transport portfolio
These four bridges belong to Stadin's transport infrastructure portfolio, alongside projects such as bus stops and stations. You can see full details of every project on our projects page.
Conclusion
From Kemang Pratama Bridge in 1991 to the Ventura – MRT Fatmawati Connecting Bridge in 2024, Stadin's bridges range from road bridges spanning 28 to 48.8 m to a pedestrian bridge linked to an MRT station. Each had different soil, loads and site constraints, so each design was calculated for that project.
If you are planning a road bridge or connecting bridge, or want an existing bridge assessed, see our bridge design service.
This article provides general information. Every project still needs to be analysed and calculated by a competent structural or geotechnical engineer, in line with the applicable SNI codes and regulations.
Sources
- Fatmawati Indomaret MRT station, Wikipedia
- Resmikan MRT Jakarta, Presiden Jokowi: Rawat dan Jaga MRT Kita, Kementerian Sekretariat Negara