Building expansion joints let a structure cope with thermal movement, settlement and seismic sway. Learn what they do, where they go and what goes wrong.

20 November 2026 · 5 min read · Stadin

Key points

  • An expansion joint splits a building into structural blocks that can move independently.
  • Joints accommodate thermal movement, prevent pounding in earthquakes and separate differential settlement.
  • Seismic joint width is calculated from inelastic displacement under SNI 1726:2019 clause 7.12.3, not a rule of thumb.
  • Most problems are in the details: rigid fill, finishes built across the gap and services without flexible connections.

A building expansion joint is a deliberate gap that splits one building into several structural parts that can move independently. On site it often looks like nothing more than a straight line across a floor, wall or roof. Behind that line, though, is a design decision that affects how the building behaves in an earthquake, as temperatures change, and as the ground beneath it settles.

This article explains what building expansion joints do, where they usually go, and the detailing mistakes we often find when assessing existing buildings.

What is a building expansion joint?

A structural joint is a full separation: the columns, beams and slabs on either side of the gap are not connected. Each separated part is treated as its own structure and analysed as a separate building. The gap is then closed with an expansion joint cover so floors stay level, water stays out and finishes look tidy.

In practice, the word "joint" covers several kinds of gap with different purposes:

  • Expansion and shrinkage joints, which give concrete and steel room to expand and contract.
  • Seismic joints, which stop two structures from pounding into each other as they sway.
  • Settlement joints, which separate parts of a building whose loads or foundations differ greatly.

One gap can serve more than one purpose, but its width must suit the most demanding one.

Why building expansion joints matter

Room for thermal movement. Buildings expand and contract with temperature, both during construction and in service. In a long building, small movements in each member add up to significant movement at the ends. If that movement is restrained, the resulting forces cause cracks in unpredictable places, especially in brittle walls and finishes.

No pounding in an earthquake. Two adjacent structures sway differently during an earthquake. If the gap is too narrow, they can strike each other, damaging columns and slab edges at the joint.

Simpler structural behaviour. L-, T- and U-shaped plans, and buildings that combine tall and low parts, tend to respond irregularly to earthquakes. Splitting them into simpler blocks often makes the analysis and the actual behaviour easier to control.

Separating differential settlement. A tower and a low podium put very different loads on the ground. On soft soil, the difference in settlement can damage the beams and slabs connecting them unless they are separated.

Seismic joint width under SNI 1726:2019

Clause 7.12.3 of SNI 1726:2019, Indonesia's seismic code, covers structural separation. The gap must accommodate the maximum inelastic displacement (δM) at critical locations, taken from the structural analysis:

  • δM = Cd × δmax / Ie, where Cd is the deflection amplification factor, δmax the maximum elastic displacement at the critical location, and Ie the seismic importance factor.
  • Adjacent structures on the same property must be separated by at least δMT = √(δM1² + δM2²), combining the inelastic displacements of both structures at their facing edges.

So a seismic joint width is not a rule of thumb. It depends on stiffness, height, structural system and risk category, and must be calculated by a structural engineer for each project. We explain risk categories in our article on SNI 1726 risk categories.

Typical joint locations

LocationMain reason
Re-entrant corners of L, T, U plansIrregular shape, force concentration
Between tower and podiumDifferent height, load and settlement
Very long buildingsThermal movement and shrinkage
New building beside an old oneDifferent behaviour and foundations
Where two structural systems meetDifferent stiffness and materials

In multi-tower complexes, such as the IKN government buildings, splitting the building into blocks and placing joints is an important part of design coordination from day one.

Foundations depend on the type of joint. Settlement joints usually continue through the foundation, because their purpose is to let both parts settle differently. For thermal or seismic joints, whether the foundation is separated is decided case by case, based on soil conditions and design.

Common expansion joint mistakes

When we assess existing buildings, the same problems keep appearing:

  1. Gaps filled with rigid material. Mortar, leftover concrete or tiles in the gap stop it from moving, so forces that should be released go into the structure and finishes.
  2. Joints that stop at the structure. The frame is separated, but brick walls, ceilings, façades or parapets run straight across the gap. These are usually the first to crack.
  3. Unsuitable joint covers. A cover not designed for the calculated movement can come loose, leak, or even block the joint.
  4. Rigid services across the joint. Water pipes, sprinklers, ducts and cable trays crossing without flexible connections are easily damaged when the blocks move.
  5. Misaligned floor levels. If floor levels differ, a slab edge on one block can strike a column on the other during an earthquake.
  6. Joints added or closed during renovation. Closing a gap to enlarge a room needs a structural review, just like adding a storey.

Tip: During routine building inspections, check that joint gaps are free of hard material, covers are intact, and there are no cracks running parallel to the joint in walls or ceilings. Record what you find and discuss it with a structural engineer.

Joints, architecture and MEP

Because the structure is separated, everything that crosses the gap must be designed to move. Façades and walls need special connection details, roof and basement waterproofing needs a system that tolerates movement, and MEP routes need flexible connections. Fire-rating also matters: an unsealed joint can let fire and smoke pass between floors.

In renovations, joint positions also shape the new layout. A room can span a joint, but its floor, wall and ceiling finishes must follow the joint line.

Conclusion

An expansion joint is more than a line on the floor. It gives room for thermal movement, settlement and seismic sway, and its width must be calculated under SNI 1726:2019 for each building. Most problems come not from the concept but from the details: gaps filled with rigid material, finishes built across the joint, and services installed without flexible connections.

If you are planning a new building or want the joints in an existing one checked, our structural design team can help.

This article provides general information. Every project still needs to be analysed and calculated by a competent structural or geotechnical engineer, in line with the applicable SNI codes and regulations.